Sinopec Operation Site Safety Cross Inspection Team Visited the Company


From December 5th to December 7th, led by Mr. Sun Rui, Chief Safety Director of Hainan Petrochemical Company Limited, Sinopec operation site safety cross inspection team visited FREP for safety inspection focusing on contractor safety management and operation site management.

The inspection team recognized the establishment and improvement of HSE management system of the Company's safety regulations, especially the development of a complete safety rules and regulations system, performance in contractor and maintenance site management. And through the implementation of the “Safety Act Index (SAI)”, “LMRA”, “Hand in Hand” and other distinctive safety tools, the safety skills of FREP employees and contractors were effectively improved, and the maintenance site safety supervision level was also enhanced.

Mr. Zhao Tianxing, Operation General Manager, pointed out that with the increasingly stringent safety and environmental regulations and higher standards, all the staff of the Company must keep in mind the purpose of safety production and ensure that everything was safe and reliable. He put forward four requirements in terms of the HSE management: the first is to follow “Dive Determinations Principles” to identify the proposed problems one by one and rectify within a definite time and make rectification reports level by level; the second is to find out the problems and draw inferences about other cases from one instance, and give top priority to strengthen the contractor qualification examination; the third is to establish a tracking system, to arrange special personnel to follow up the identified problems and report timely, eliminate the relaxing disposal; the fourth is to sum up the inspection experience, and improve the efficiency and effectiveness of safety inspection.

In view of the problems found in the inspection, Mr. Lin Bin, Deputy General Manager of HSE Department, said that they would implement measures specific to the problems identified by the inspection team, rectify one by one and they would leave no dead corners.

During the inspection, the inspection team, by viewing records, visits, interviews and on-site inspection, checked the Company’s HSE Department, Mechanical Department, Process Department, Fuels-1 BT, Olefin BT, PO BT and relevant maintenance sites, and made inspections on the Company’s contractor qualification examination, contractor safety training, bidding& tendering management, sub-contractors management, safety engineering scheme management, on-site construction safety management, special operations management, safety inspection, self-inspection and rectification etc..

Management and relative personnel in HSE Department, Process Department, Mechanical Department and BTs participated in the summary meeting, and accompanied the inspection team for field inspection. (Liu Qiaohui, Zhang Lei)